Every safety-critical item, proved before it's hidden.

One evidence record for every safety-critical item in a higher-risk building, built up on site while the work is still open. When the Gateway 3 application comes, the evidence is already there.

Gateway Three, from BIM Technologies. Works alongside the tools your project already uses.

A missing photograph is fixable for about three weeks.

Gateway 3 asks about each item, not each package. Risers are boarded and ceilings closed floor by floor on programme, and after that the only way to evidence what is behind them is to open up.

One record per item, built as you go.

Not a folder of photographs at the end of the job. A single record for each item, filled in while it can still be seen.

  1. Designed

    What each item was meant to be, taken from the design information.

  2. Installed

    What was actually fitted, and who fitted it.

  3. Evidenced

    Proof captured on site before the item is closed in.

  4. Accepted

    Accepted by a named dutyholder. Never by software.

  5. Kept current

    When the design or the programme changes, you see what it affects.

What it gives your project team.

Gaps found while they're fixable

Floor by floor, ahead of each closure, not at the end of the job.

Gateway 3 without the hunt

The evidence for the completion certificate application, gathered as the job progresses.

Competence on the record

Who did the work, and the basis on which they were judged competent.

Change you can follow

Design and programme revisions show what they affect, for a person to decide.

Nothing to install on site

Operatives use their phone's browser. Trades keep the tools they already use.

A history you can stand behind

Nothing is overwritten. Every decision carries who made it and when.

Set up by people who know the models.

BIM Technologies has spent years inside the design information on complex buildings. We set the platform up around yours, so your teams start recording on day one.

  1. 01

    We set it up

    Your project, built from your design information and your programme.

  2. 02

    Site records it

    Your trades capture evidence as the work goes in, before it is closed up.

  3. 03

    You decide

    Your dutyholders review, accept and hand over, with the record behind every item.

The software documents decisions. It never makes them.

No verdicts

Nothing is declared compliant by the platform. It reports; a person accepts.

No hidden thresholds

No score decides that a contractor is capable or a person competent.

No face recognition

People on site are never matched or tracked by software.

No silent history

A correction is a new entry. Nothing is quietly edited or deleted.

See it on your own building.

Thirty minutes on the platform with our team, then a conversation about a pilot on a live higher-risk building job.